I-20 OVER WATEREE AND SWAMP OVERFLOW BRIDGE REHABILITATION / REPLACEMENT PACKAGE


The South Carolina Department of Transportation (SCDOT) proposes to replace the existing eastbound and westbound bridges on I-20 over the Wateree River. Additionally, two pairs of overflow bridges along I-20 over Wateree Swamp will be rehabilitated which will help extend the service life. The project limits extend from the Lugoff Pond bridges to I-20 Exit 98 (US 521). The goals of the project are to reduce impacts to the traveling public by eliminating recurring bridge deck repairs, produce a durable and easily maintainable facility, and extend the service life of the existing overflow structures.

Profile View of River Bridge

Profile View

Plan View of River Bridge

Plan View


Project Location

Map of proposed area of construction Project Viewer

Project Milestones

  • April 2023 – Design-Build Contract Awarded
  • Spring 2024 – Final Design Completed
  • Winter 2023 – Begin Construction
  • Fall 2027 – Substantial Project Completion

Project Updates

  1. August 2023 Update
  2. October 2023 Update
  3. December 2023
  4. April 2024
  5. July 2024

Should you have any questions or need further information, please contact SCDOT Resident Construction Engineer Santosh Nair, PMP at (803) 737-1847 or at NairSV@scdot.org.